ABOUT CUBE CAVING™
A revolutionary underground mining methodology — patented, simulation-validated, and engineered for the world's most demanding ore bodies.
A REVOLUTIONARY DESIGN
Cube Caving™ is a patented block cave mining layout that fundamentally rethinks the geometry of underground extraction. Where conventional layouts are constrained by LHD productivity and geotechnical instability at depth, Cube Caving™ removes both constraints simultaneously.
The design integrates the lower drawbell and undercut into a single large 4-sided drawbell — eliminating flat spots that interrupt ore flow and allow cave loads to build up. A grid layout with large pillars and 90° intersections provides structural integrity at depths towards and beyond 2,000m.
Key Design Features
HOW IT WORKS
Extraction Drive Layout
Extraction Drives inside the footprint are mined higher to enable trucks to be loaded at all intersections within the cave footprint.
Loader Operation
Loaders operate on a maximum tram of 45m. Trucks can be loaded from both sides or progress along the Extraction Drive to be loaded by multiple LHD.
Traffic Flow
Trucks operate in a consistent loop to reduce congestion. LHD or Secondary Break unit can fit within the Drawpoint allowing Trucks to pass in the Extraction Drive without interference.
HOW THE DRAWBELL IS ESTABLISHED
The Cube Caving™ drawbell establishment sequence is engineered for precision and efficiency — using a post-undercut sequence with multiple firings from two levels.
Post Undercut Sequence — Multiple Firings from 2 Levels
Technical Notes
PRODUCTIVITY ANALYSIS
Validated by Deswik's ORB Simulator
Productivity simulation was conducted using Deswik's industry-leading ORB simulator, confirming the assumptions of LHD and truck numbers and validating the Cube Caving™ layout's exceptional performance.
OVERALL BENEFITS
Cube Caving™ delivers measurable improvements across every dimension of mine performance — from the foundation of stability through to revenue.
Performance Improvements
Cost Reductions
BENEFITS — IMPLEMENTATION & EXECUTION
Implementation Scheduling
Operational Performance
Cost Estimation
DR GEOFF DUNSTAN
Director — Caveman Consulting
Sydney, Australia
30+ years in underground mining, block cave operations and large-scale mine development
BEng (Mining Engineering), University of Wollongong
MBA (La Trobe University)
PhD Mining Engineering (University of Queensland)
Core Competencies
Career History
2016–Current: Director, Caveman Consulting including Technical Director, Cave Mining 2040 Research Consortium 2023–Current
2010–2016: Progressive Mining Leadership Roles, Newcrest Mining (Head of Mining, Manager Underground Production, Ridgeway Mine Manager)
1999–2010: Technical Mining Leadership and Study Management Roles, Newcrest Mining (Ridgeway SLC, Telfer SLC, Ridgeway Deeps BC, Wafi Golpu BC)
1993–1998: Mining Engineer, WMC Resources
Project Highlights
Provides independent due diligence, study coordination, strategic technical advice and mine management coaching for underground mining projects through Caveman Consulting.
Currently leads technical direction for the Cave Mining 2040 Research Consortium, driving collaborative research to improve the safety, productivity and sustainability of future cave mining operations.
Directed mining operations at Newcrest's Cadia Valley Operations, increasing Ridgeway Deeps Block Cave production by more than 35% (7.2 Mtpa to 10 Mtpa) while reducing operating costs by 50%.
Led delivery of the Cadia East Panel Caves, establishing international benchmarks for block cave ramp-up performance and achieving nameplate production ahead of industry norms.
Established the Ridgeway Deeps Block Cave from early stage Studies and development through to successful production ramp-up. Introduced advanced operational data management and site asset operating centre capabilities to improve mine performance and decision-making.
READY TO APPLY CUBE CAVING™?
Connect with our team to discuss how the Cube Caving™ methodology can be applied to your project.